
MnDOT Smith Avenue High Bridge CMGC
Kraemer removed and replaced the Smith Ave. High Bridge deck over the Mississippi River. The existing bridge was a post tensioned steel structure that required a specific removal and replacement sequence to keep the structure stable. Our unique de-tensioning system constructed a mock-up of the existing tendon and de-tensioning system in our yard to demonstrate safety in the approach to de-tension the bridge.
|